IC23 Carpentry III
Course Type: Adopted
Course Outcomes:
- Calculate, layout, and cut out stair stringers.
- Select and install components used in the building envelope system to sufficiently seal a structure.
- Estimate and install common types of materials used in roofing.
- Lay out and install common exterior siding to a structure.
| Standard/Objective Number | Standard/Objective | Course Weight | RBT Designation |
|---|
| 1.00 | Understand the stages of the building process, building codes and standards, and the primary roles for a construction project. | 5% | C2 Understand Procedural |
| 2.00 | Apply procedures to calculate, layout, and cut out stair stringers that meet the requirements of a stairway’s design. | 15% | C3 Apply Procedural |
| 3.00 | Apply a building envelope that consists of rough openings for door and window installation and building wrap. | 12% | C3 Apply Procedural |
| 4.00 | Apply procedures to estimate and install common types of materials used in roofing. | 30% | C3 Apply Procedural |
| 5.00 | Apply insulation materials and vapor barrier to walls, floors, and roof decks. | 8% | C3 Apply Procedural |
| 6.00 | Apply procedures to lay out and install common exterior siding to a structure. | 30% | C3 Apply Procedural |